Decks
Deck Pricing
Straight answers about what a deck costs — pressure-treated versus PVC, refreshing an existing deck versus a full tear-down and rebuild, and what actually moves the price. Every deck is different, so your exact number comes from a free, no-pressure consultation, but this page will help you budget with confidence. Call us anytime at (781) 293-1417.
What You're Paying For
The DelPrete Deck System
When we quote a deck, we’re pricing a structure — not just the boards you walk on. What you see is the decking and the railing. What keeps you safe is everything underneath: the footings, the ledger, the framing, and the flashing where the deck meets your house.
We build two kinds of decks: pressure-treated (PT) and PVC — AZEK® and Wolf. We hold top-tier certifications with both PVC manufacturers, which is not something most contractors can say.
Our credentials
- AZEK® Platinum Contractor — the top tier of the TimberTech/AZEK contractor program.
- Wolf Pro Installer — Wolf’s top-tier installer certification.
- Fully licensed (MA CSL & HIC) and insured.
Those certifications matter for one very practical reason: the strongest manufacturer warranties are only available when the deck is installed by a certified contractor, to the manufacturer’s spec.
A complete deck — not just the boards:
- All necessary building permits, and the structural inspection with your town
- Footings dug below the Massachusetts frost line — 48 inches
- A properly attached and flashed ledger board where the deck meets your house
- Pressure-treated framing, beams, and posts, correctly spanned and spaced
- Framing at 12″ on center — our standard, not the minimum. Code and the manufacturers allow 16″ on center for PVC, and 16″ is where we frame pressure-treated. But because PVC is a more flexible board, we frame every PVC deck at 12″ on center — the whole deck, not just the stairs, where 12″ is required. Tighter joist spacing means less span between supports, and less opportunity for a board to sag over time. Very few companies do this.
- Structural hardware and hidden fasteners
- Decking, railings, stairs, and trim
- Removal and disposal of the old deck
- Manufacturer-backed and written workmanship warranties
Cheaper quotes often leave pieces of this out — usually underground, where you’ll never see it until something moves. That’s the single biggest reason two “new deck” prices can look so different.
Compare the Decking
Pressure-Treated vs. PVC Decking
The frame under your deck is pressure-treated lumber either way — unless you opt for luxury aluminum or fiberglass framing. The real decision, and most of the price difference, is the decking and railing you walk on and touch.
Here’s the honest trade-off: PT costs less today and more over time. PVC costs more today and almost nothing after that. Over a 20-year horizon, PVC usually wins the math — but PT is still the right call for plenty of homeowners, and we’ll never push you off it.
Between the two PVC lines, there is no price difference. AZEK® and Wolf are both capped cellular PVC, and we’ve negotiated our supplier pricing so they land at the same number. The real difference is the color and finish options — so pick the board you like the look of, not the one you think is cheaper.
Pressure-Treated
$
The budget-friendly classic
Pressure-treated pine
What to know:
- Lowest upfront cost
- Real wood look; can be stained or painted any color
- Needs cleaning, staining, and sealing every 1–3 years
- Typical service life of roughly 10–15 years
- Boards can warp, splinter, and check over time
AZEK® PVC
$$
Capped cellular PVC — widest color range
Capped cellular PVC
What to know:
- Capped cellular PVC — no wood fiber to absorb water, rot, or feed mold
- Won’t rot, warp, splinter, or need staining or sealing
- Stays cooler underfoot than most composites
- The widest range of colors and finishes
- Among the strongest warranties in the industry
- Installed by us as an AZEK® Platinum Contractor
Wolf PVC
$$
Capped cellular PVC — same performance, same price
Capped cellular PVC
What to know:
- Capped cellular PVC — the same core performance as AZEK®
- Won’t rot, warp, splinter, or need staining or sealing
- The same price as AZEK® — we’ve negotiated it that way with our suppliers
- A more focused color range — the practical difference between the two
- Installed by us as a Wolf Pro Installer
Pressure-Treated
Pressure-treated pine
Choose PT if: upfront budget is the priority, or you don’t mind the upkeep.
AZEK® PVC
Capped cellular PVC
Choose AZEK if: you want the widest choice of colors and finishes.
Wolf PVC
Capped cellular PVC
Choose Wolf if: you want PVC performance at a friendlier price.
What We Do
Deck Refresh vs. Full Tear-Down & Rebuild
We focus on two kinds of deck projects. Understanding which one you need is the single biggest factor in what your deck will cost.
Deck Refresh — New Decking and/or Railings
If the structure underneath is sound, we can replace the decking, the railings, or both — and leave the framing in place. You get a brand-new deck surface for meaningfully less than a full rebuild.
Best for
- A frame with no rot in the joists, ledger, posts, or footings
- Decks where the boards are worn but the bones are good
- Homeowners upgrading from PT boards to PVC
The Catch
- The frame has to be inspected first — and it has to pass
- PVC generally requires 16″ on-center joists. Older decks framed at 24″ on center need a new joist sistered in between each existing one before they can take PVC
- If the ledger, footings, or posts are compromised, a refresh isn’t safe — and we’ll tell you
Full Tear-Down & Rebuild
The old deck comes out entirely — down to the footings — and we build new: new footings below the frost line, new ledger and flashing, new framing, new decking, railings, and stairs.
Best for
- Any rot in the framing, ledger, posts, or footings
- Decks 15+ years old, or with repeated failures
- Decks that were never permitted or don’t meet current code
- Changing the size, shape, or layout of the deck
Benefits
- A structure that is code-compliant and inspected
- Footings dug below the 48″ Massachusetts frost line
- A properly flashed ledger — the #1 place decks fail and leak into the house
- Full manufacturer warranty eligibility
- The deck you actually want, not the one you inherited
What We Don’t Do: Repairs
We don’t offer deck repairs, and we want to be upfront about why.
Patching a few boards or sistering one bad joist rarely solves the actual problem. If a deck is failing in one place, it is almost always failing in others you can’t see — and a repair puts our name on a structure we didn’t build and can’t stand behind. Decks are the one part of a home that can collapse with people standing on it, and we aren’t willing to take that risk with a partial fix.
What we will do is inspect your deck honestly and tell you which of the two paths above makes sense — or tell you it’s fine and you don’t need us yet.
Cost Drivers
What Raises the Price
Deck Size
Square footage is the starting point. Bigger decks cost more in total — though the cost per square foot usually drops as size increases, because mobilization, design, and setup get spread across more deck.
Decking Material
The single biggest choice. The frame is pressure-treated either way, so nearly the entire price gap between a PT deck and a PVC deck is the decking boards and the railing — not the structure.
Railings
Homeowners routinely underestimate this one. Railing is a major line item, and it scales with the perimeter of the deck, not the area. Basic PT rails are the cheapest; PVC, composite, aluminum, and cable or glass systems cost considerably more.
Deck Height & Elevation
A ground-level deck is the cheapest to build. Once you’re above 30 inches, code requires guardrails. A raised deck needs taller posts and more framing; a second-story deck costs more still. Elevation is one of the biggest hidden cost drivers.
Stairs
Every stair run adds framing, footings, and labor — and a long run down from an elevated deck adds a lot of all three.
Footings & Frost Depth
Massachusetts code requires footings below the frost line — 48 inches. That means real excavation and concrete on every single project. It’s a big part of why decks cost more here than the national averages you’ll read online.
Tearing Out the Old Deck
Demolition and disposal happen before a single new board goes down. Bigger and taller old decks cost more to take apart and haul away.
Joist Spacing on a Refresh
If you’re re-decking an older frame built at 24″ on center with PVC, a new joist has to be sistered in between each existing one to get to 16″. It’s a hidden cost that catches a lot of homeowners off guard — and it’s one of the first things we check.
Rot & Structural Repairs
Anything we find once the old decking is off — a compromised ledger, rotted joists, undersized posts — has to be corrected. We document it with photos first.
Design Complexity
Multi-level decks, angles and curves, picture-frame borders, herringbone or diagonal board layouts, and built-ins like benches or planters all add significant labor.
Add-Ons
Integrated lighting, a pergola, privacy walls, skirting, under-deck drainage, and outdoor kitchens all add to the total.
Site & Access
Tight or sloped lots, poor soil, limited staging space, and long carries from the street all add hours.
Cost Drivers
What Lowers the Price
Just as often, a project lands at the lower end of the range simply because it’s straightforward:
- A simple rectangular deck with no angles, curves, or multiple levels.
- A ground-level deck — no guardrails required under 30 inches.
- Choosing pressure-treated decking and railings over PVC.
- A refresh on a sound frame rather than a full tear-down and rebuild.
- An existing frame already at 16″ on center, ready to take PVC without sistering.
- Fewer stairs, and shorter stair runs.
- Standard railing rather than cable, glass, or aluminum.
- Skipping lighting, built-ins, and skirting.
- Easy access and a flat, stable site.
- Bundling the deck with your roofing, siding, or windows.
Typical Cost
What a New Deck Typically Costs
Below are typical installed ranges for Eastern Massachusetts. Decks vary enormously with height, stairs, railing, and design, so these are planning ranges — your exact price is confirmed after a free on-site consultation.
Typical Installed Cost
| Project Type | Per Sq. Ft. |
12′×16′ ~192 sq ft |
16′×20′ ~320 sq ft |
20′×24′ ~480 sq ft |
|---|---|---|---|---|
|
Deck Refresh
New decking and/or railings on a sound existing frame |
$100 – $160 | $19,000 – $31,000 | $32,000 – $51,000 | $48,000 – $77,000 |
|
Full Rebuild — Pressure-Treated
Tear-down and rebuild, PT decking and railings |
$100 – $200 | $19,000 – $38,000 | $32,000 – $64,000 | $48,000 – $96,000 |
|
Full Rebuild — AZEK® / Wolf PVC
Tear-down and rebuild, capped cellular PVC |
$180 – $320 | $39,000 – $69,000 | $39,000 – $69,000 | $39,000 – $69,000 |
Decks vary more than anything else we build.
Be careful with any deck number you see — including ours. Deck pricing can swing dramatically compared to everything else we offer, because there are simply more variables: the height of the deck, the decking you choose, the layout, the stairs, the railing system, and the post and baluster options — to say nothing of lighting. Two decks with the same square footage can be very different projects.
That’s why we price by the square foot, and why the ranges above are wide. A simple, ground-level, rectangular deck with basic railings sits at the bottom of its range. A raised deck with multiple stair runs, a cable or aluminum railing system, and integrated lighting sits at the top — or above it.
Massachusetts costs more. Our code requires footings below the frost line — 48 inches. That is real excavation and real concrete on every project, before a single board goes down.
Value vs. Price
Why Some Companies Cost More — or Less
When one deck estimate is thousands of dollars less than another, it’s almost never because you’re getting the exact same deck for less.
A deck is a structure. Most of what makes it safe is buried or hidden — the footings, the ledger connection, the flashing, the hardware. It is very easy to make a deck look finished and very cheap to build one that will fail, and you will not be able to tell the difference by looking at it.
Before comparing the bottom-line price, compare what’s actually included.
What you’re paying for with a quality builder:
- A fully licensed (MA CSL & HIC), insured contractor that stands behind its work.
- AZEK® Platinum Contractor and Wolf Pro Installer certifications — top-tier status that unlocks the strongest manufacturer warranties.
- A permit pulled and a structural inspection passed with your town.
- Footings dug below the 48″ frost line — not shallow pads that heave every winter.
- A ledger board correctly lagged and flashed where the deck meets your house.
- Correct joist spacing for the decking you chose — including sistering an old 24″ frame to 16″ for PVC.
- Proper structural hardware and hidden fasteners.
- Experienced, trained carpenters, rather than temporary day-labor subcontractors.
- Complete demolition and off-site disposal of the old deck.
- A written workmanship warranty in addition to the manufacturer’s warranty.
- Transparent pricing without high-pressure sales tactics. Some companies build large sales commissions and high overhead into their estimates, while others focus on delivering quality workmanship at a fair price.
Where a cheaper bid often cuts corners:
- No permit and no inspection (which we see often) and no written warranty.
- Shallow footings that don’t reach the frost line — the deck heaves and racks within a few winters.
- A ledger nailed rather than lagged, and never flashed — which rots your rim joist and leaks into the house.
- Screwing PVC decking onto a 24″ on-center frame, which voids the warranty and leaves the boards to sag.
- Undersized joists, beams, or posts, and spans that don’t meet code.
- Using the wrong fasteners, or the wrong structural hardware.
- Leaving the old deck debris on site, or dumping it improperly.
- Unlicensed or uninsured labor — which can become your liability on a structure people stand on.
- An installer who isn’t certified, so the manufacturer warranty can never be registered.
A lower number can absolutely be the right choice — but only when it’s genuinely the same structure. On a deck, the parts you can’t see are the parts that matter most.
The Devil’s in the Details
What to Watch Out for When Comparing Deck Estimates
Not all deck proposals are created equal.
Some estimates clearly explain exactly what you’ll receive. Others are little more than a single price on a piece of paper.
With a deck, this matters more than almost anywhere else on your home — because most of what you’re paying for gets buried or covered up. If an estimate isn’t detailed, you may not know what’s included — or, more importantly, what’s not included — until years later, when something moves.
Before choosing a contractor, make sure your proposal answers these questions.
Does the estimate specify the exact materials?
- Decking brand and line (AZEK®, Wolf, or PT)
- Board color and profile
- Railing system and infill
- Framing lumber and hardware
- Fastener system (hidden or face-screwed)
If it simply says “new deck,” ask for more detail.
Is it a refresh or a full rebuild?
The proposal should be explicit about whether the existing frame, footings, and ledger are being re-used or replaced. These are very different jobs at very different prices — and very different levels of risk.
Does it address the footings?
Ask how deep the footings go. Massachusetts requires below the frost line — 48 inches. This is the single most common corner cut, and it is completely invisible once the deck is built.
Does it address the ledger and flashing?
The ledger is where the deck attaches to your house, and it is the #1 place decks fail. Ask how it is fastened and how it is flashed. A deck that pulls off the house takes the wall with it.
Does it confirm the joist spacing?
PVC decking generally requires joists at 16″ on center. If your existing deck is framed at 24″, a new joist has to be sistered between each existing one. Make sure the quote says which spacing your frame has — and who is paying to fix it.
Does it include the permit and inspection?
A professional proposal should state whether the permit is included, who pulls it, and whether the structural inspection is coordinated with your town.
Does it explain what happens if rot is found?
On a refresh, the framing isn’t fully visible until the decking is off. The estimate should explain how damage will be documented, how repairs will be priced, and whether you’ll be notified before work continues.
Does it cover demolition and disposal?
Ask whether the proposal includes:
- Tear-out of the existing deck
- Dumpster and disposal fees
- Daily cleanup
- Protection of your lawn and landscaping
- Final debris and fastener removal
Does it clearly explain the warranties?
A good estimate should identify:
- Manufacturer material warranty
- Whether the installer is certified to register it
- Workmanship warranty
- Who stands behind each warranty
- What is required to keep the warranty valid
Does it list exclusions?
Every proposal should explain what is not included. Common exclusions include:
- Structural repairs found after demolition
- Sistering joists for PVC spacing
- Electrical work for lighting
- Landscaping repair
- Skirting or under-deck drainage
- Painting or staining
Knowing the exclusions upfront helps prevent surprise charges later.
A Good Deck Estimate Should Leave Very Few Questions
The best proposals don’t just tell you what the deck costs — they explain exactly what you’re paying for, above ground and below it.
If you finish reading an estimate and still have a long list of questions, that’s usually a sign the proposal isn’t detailed enough. A professional deck builder should make it easy to understand the scope of work before you sign a contract.
Pricing FAQs
Common Pricing Questions
Why do deck quotes vary so much?
Because “a new deck” can mean very different things — and most of the difference is underground.
One estimate may include footings dug below the 48″ frost line, a properly lagged and flashed ledger, correctly spanned framing, hidden fasteners, a permit, and a passed structural inspection. Another may be shallow pads, a nailed ledger, no flashing, and no permit — and the finished decks will look identical on day one.
The material choice is the other half. Because the frame is pressure-treated either way, nearly the entire gap between a PT deck and a PVC deck is the decking boards and the railing.
The bottom line is that the lowest price isn’t always the best value, and the highest price doesn’t automatically mean the best deck.
We’re happy to review another contractor’s proposal with you, line by line, so you can make an apples-to-apples comparison and understand exactly what’s included in every estimate.
Do you price-match?
Generally, no.
A deck is a structure that people stand on, and the parts that make it safe — footings, ledger, flashing, framing, hardware — are exactly the parts a cheaper bid leaves out. Matching a lower price would mean matching a smaller scope, and that’s not something we’re willing to do on a structure.
Rather than inflating our prices with the expectation of negotiating later, we provide our best price upfront. In most cases, there’s very little room to reduce the cost without changing the scope of work, the materials, or the quality of the build.
If you’ve received another quote, we’re happy to review it with you and explain any differences in the structure, materials, or warranties so you can make an informed, apples-to-apples comparison.
Get a Free, No-Pressure Deck Quote
We’ll inspect your existing deck, tell you honestly whether it needs a refresh or a full rebuild, and give you a clear written quote — no pressure, no obligation.